Four-record sequence
What belongs in a continuity brief?
Treat a power loss as a containment and evidence problem first. Equipment diagnosis and repair remain separate qualified work.
Hold
Name the physical perimeter, gates or occupied fallback area that contains cattle without relying on the energized line.
Locate
Record the affected zones, the last normal check, utility or source status, weather, visible damage and the person who isolated the event.
Compare
List only manufacturer-compatible, previously approved backup options. Record availability and owner; do not invent wiring or automatic transfer instructions.
Restart
After qualified inspection, record the restored source, fence-system check, changed conditions, exception owner and time cattle status was reconfirmed.

