Choose the fence role
Separate secure perimeter fencing from permanent paddock divisions, temporary rotational divisions and cattle-handling facilities. Each role can use different materials and maintenance assumptions.
A 10-head herd and a 100-head herd do not automatically require fixed lengths of wire. Measure the site, assign each fence a job and calculate from the layout.
Separate secure perimeter fencing from permanent paddock divisions, temporary rotational divisions and cattle-handling facilities. Each role can use different materials and maintenance assumptions.
Record actual perimeter and divider line lengths. Subtract gate openings only when the gate replaces the same fence line. Keep lanes, water access, equipment movement, corners and changes in direction visible on the plan.
Enter measured line lengths below. The result is a transparent purchase-length starting point; posts, braces, tension hardware and electrical components require a separate layout review.
Enter the measured perimeter to begin. Results use the unit you enter.
Add corners, end assemblies, gate posts, line posts, tensioning and attachment hardware, coating requirements and—when electric fencing is involved—energizer, grounding, insulators and warning provisions. Confirm product-specific instructions and local rules before construction.
Choose a fence familyUse herd size to discuss movement, water, gates, handling and expansion. Use the measured layout to purchase fence.
The workflow follows the planning order described by university extension resources: map the site, define gates and lanes, measure the lines, then prepare the material list.
Send the line length, fence role, livestock mix, terrain, gate plan, destination and preferred product format.