Plan the fence, then count it.

A 10-head herd and a 100-head herd do not automatically require fixed lengths of wire. Measure the site, assign each fence a job and calculate from the layout.

This tool estimates fence line and whole rolls. It does not set stocking rate, structural spacing, legal requirements or site-specific safety specifications.

Choose the fence role

Separate secure perimeter fencing from permanent paddock divisions, temporary rotational divisions and cattle-handling facilities. Each role can use different materials and maintenance assumptions.

PerimeterPermanent divisionTemporary divisionHandling area

Measure the layout

Record actual perimeter and divider line lengths. Subtract gate openings only when the gate replaces the same fence line. Keep lanes, water access, equipment movement, corners and changes in direction visible on the plan.

Calculate a starting quantity

Enter measured line lengths below. The result is a transparent purchase-length starting point; posts, braces, tension hardware and electrical components require a separate layout review.

Used for the project brief, not to infer fence length.
Required. Use the same unit throughout.
Enter 0 if no permanent divider is planned.
Only openings that replace fence line.
Confirm the actual product roll length before ordering.
An allowance is not a substitute for accurate field measurement.

Starting quantity

Net measured fence line
Length after allowance
Whole rolls
Head count in project brief

Enter the measured perimeter to begin. Results use the unit you enter.

Complete the bill of materials

Add corners, end assemblies, gate posts, line posts, tensioning and attachment hardware, coating requirements and—when electric fencing is involved—energizer, grounding, insulators and warning provisions. Confirm product-specific instructions and local rules before construction.

Choose a fence family

10 head and 100 head are planning scenarios

Use herd size to discuss movement, water, gates, handling and expansion. Use the measured layout to purchase fence.

10-head example

  • Prioritize a secure perimeter and simple access.
  • Check whether existing fence can be upgraded.
  • Use adjustable internal divisions where management may change.
  • Keep a small-project material list transparent.

100-head example

  • Separate perimeter, permanent divisions and temporary divisions.
  • Coordinate water, lanes, equipment gates and handling facilities.
  • Plan maintenance access and phased construction.
  • Allow future subdivision without rebuilding the perimeter.

Turn the measurement into a quote brief.

Send the line length, fence role, livestock mix, terrain, gate plan, destination and preferred product format.

Request specification review